The all-around size. Most Conejo ranch roofs and most remodels land here.
The 20 yard is the money size in residential roll off work, and it earns it. About 6 pickup truck loads of capacity covers most Conejo ranch roof tear-offs, most kitchen and bath remodels together, and most whole garage cleanouts, in a bin that still behaves on a residential driveway.
If you only read one size page, read this one, then check it against the size finder. More rentals start at 20 and stay at 20 than any other line on the rate card structure.
Operator terms wait for the signed rate card. Compare all sizes on the sizes page, or look at 10 Yard and 15 Yard.
Worked example. A single layer tear-off on a 2,000 square foot ranch roof is roughly 20 squares of shingles. At common weights that is about 2 to 3 tons of material, bulky before it is heavy. A 20 yard swallows the volume easily. Two layers, or a tile roof, changes the answer: say the layers and the material on the form, because weight, not volume, becomes the limit.
A 20 yard is wrong for concrete or dirt at volume (lowboy, always), and it is overkill for a single bathroom, where a 10 yard does the same job for a smaller footprint on the driveway.
Keep the placement spot clear on delivery day, with room for the truck to line up, tilt, and roll the bin off. Overhead wires and low branches matter more than people expect. On a driveway, no permit is needed anywhere we serve. On a street, the Thousand Oaks rule and the confirm first rule for the other Conejo cities are on the permits page. Tell us about slopes, gates, and HOA conditions on the form, and placement stops being a surprise.
FAQ
Because a typical single layer residential tear-off fits by volume, the bin sits close to the house, and the crew loads over the side or through the end doors. The roofing page sizes by squares and layers.
The included weight is an operator term, stated in tons in your confirmation, with the overage per ton in the same document. Keep the load to debris and stay level with the walls.
In Thousand Oaks, street placement needs a city Encroachment Permit. In the other Conejo cities we confirm the current rule before delivery. Driveway placement needs no permit anywhere we serve. See permits.
That is a swap: the full bin is hauled and an empty one lands in the same spot. Swaps are priced in your confirmation. For long jobs, plan the swap count up front.
Send the form with the material and the city. The operator confirms the size, the exact price, the days, and the tons in writing before delivery.
Tell us the job. Your price is confirmed before delivery, with the rental period and included weight stated in writing.
One local number, one local operator, and a price confirmed in writing before the bin moves.